October 16, 2026
Kamila Hrdličková

Pulsed water meter: All you need to know

A practical guide to pulse outputs, their limits and remote reading

A pulse output does not transmit the meter's reading. Instead, it generates an electrical signal each time a defined volume of water passes through the meter, and another device must count those signals and convert them into consumption. Pulse outputs are widely used on existing water meters, either built in or added as a module, making them a common starting point for remote meter reading projects.

The principle is simple, but its limitations matter. Understanding both helps determine whether remote reading of an existing pulse meter will deliver data that matches the register.

Key takeaways

  • A pulse output emits one pulse per fixed volume of water. The pulse carries no units, no meter ID and no absolute index.
  • Pulses are generated by a reed switch, a Hall sensor or an optical sensor linked to the meter's register.
  • A pulse output, a dry contact and the standardised S0 interface are not the same thing, so electrical compatibility has to be checked before connection.
  • A digital pulse total matches the register only with the correct pulse weight, an appropriate initial counter value and reliable pulse detection. Counting and data transmission are two separate questions.
  • Encoder-based readings and M-Bus communication can provide more information than basic pulse counting, depending on the meter and its interfaces.
  • Pulse converter connects an existing pulse water meter to LoRaWAN or NB-IoT without replacing the meter, as long as the interfaces are compatible.

What a pulse output actually transmits

A pulse output is linked to the meter's register. Each time a defined volume passes, it switches an electrical circuit. The receiving device sees state changes on a wire, not litres. It counts them and multiplies the count by the pulse weight.

The pulse itself carries no additional information. There is no meter identity, no unit, no status information and no absolute index, only the information that another defined volume has passed. Everything else has to be known in advance and configured in the device that counts the pulses.

Reed switch, Hall sensor and optical sensor

Pulse outputs commonly use one of three sensing principles. A reed switch consists of two metal contacts sealed in a small glass tube, closed by a magnet as the register moves. The reed switch needs no power, but the connected counting device must provide a way to detect contact closures. The mechanical contacts can introduce counting errors. When the contacts close, they can bounce, and one closure may appear as several short pulses unless the counting device filters them out (debounce).

A Hall sensor detects a magnetic field electronically. It has no mechanical contacts and therefore no mechanical contact bounce, but as an electronic component it needs a supply voltage.

An optical sensor reads a marked element of the register with light instead of a magnet, so it does not depend on magnetic coupling. Like a Hall sensor, it needs power. Where a sensor needs power and no mains supply is available, battery-powered ACRIOS pulse converters can supply 3.3 V to the connected sensor.

Pulse output, dry contact and S0 are not the same thing

A pulse output is a general description: the meter signals volume by changing the state of an electrical circuit. How it does that varies. A reed switch provides a dry contact: a potential-free switch that only opens and closes. Electronic sensors may use different output configurations, such as an open collector.

S0 is a standardised pulse interface with defined electrical characteristics intended to support interoperability between compliant outputs and inputs. A pulse output on a water meter is not automatically an S0 output, so the meter's electrical specification has to be checked against the converter input before connection.

Pulse weight: what one pulse means

Pulse weight is the volume represented by one pulse. A pulse carries no units, so one pulse can mean 1 litre or 10 litres, and the counting device cannot tell which. The value is specified for the meter or its pulse output module and has to be configured in the counting device.

The conversion itself is simple. At 10 litres per pulse, 125 pulses mean 1,250 litres, or 1.25 m³. If the configured pulse weight is incorrect, the calculated consumption will be systematically overestimated or underestimated, potentially without an obvious indication of the error.

Pulse weight also sets the resolution. The larger the volume per pulse, the coarser the data, and the longer a small leak can run before it produces a single pulse.

In ACRIOS pulse converters, pulse weight and unit are configured per input through the Lua scripting interface, together with debounce where the meter needs it, so readings arrive already in litres or m³.

Pulse, encoder or M-Bus

A pulse is not the only way a water meter can share its reading. With a pulse output, the counting device maintains a separate running total. Matching the meter's register requires the correct pulse weight, an appropriate initial counter value and reliable pulse detection.

An encoder register provides the register value itself in digital form rather than individual pulses. M-Bus is a communication protocol that can carry the meter ID, values, units and status, and several meters can share one bus. These categories are not mutually exclusive: an encoder describes how the meter's register value is obtained, while M-Bus defines how meter data is communicated. More on the protocol in the M-Bus, wM-Bus and RS-485 technology guide.

Where a meter already offers M-Bus or wM-Bus, converters for those protocols may be a better fit. Pulse converter is an option where a compatible pulse output is the only interface available.

How to tell if a water meter has a pulse output

The most reliable source is the meter's documentation and type label. Terms such as pulse output, reed or impulse, together with a stated pulse weight, indicate that an output is available. On the meter itself, a cable or a pulse module attached to it is a visible sign that an output is already fitted.

Some meters are prepared for a pulse module but have none fitted. Which module fits and how it is mounted depends on the manufacturer. Where the markings are unclear, the manufacturer and type number are usually enough to find the right documentation.

Limits of pulse counting

Two separate questions decide whether pulse data can be trusted: whether every pulse is counted correctly at the input, and whether the counted values reach the receiving system.

At the input, errors can come from contact bounce, electrical interference from pulse cables running alongside power lines, and pulses arriving faster than the input can register. Because the pulse carries no reference value, the signal itself cannot correct a missed or extra pulse, and the digital total drifts away from the register.

Transmission is a different matter. ACRIOS pulse converters keep counting during a network outage, store the pulse values locally and send the last three readings once the connection is restored. The cumulative count is preserved, although resending the last three readings does not necessarily provide a complete consumption history for a longer outage.

Whether the converter's total has to match the register depends on the goal. If the digital value must match the register, the starting value must match the register at installation. If consumption from installation is sufficient, the count can start from zero.

Tampering and backflow are further limits. For example, a cut cable stops pulses altogether. A basic single-channel pulse output does not indicate flow direction. Detecting backflow therefore requires a meter or sensing arrangement that can distinguish flow direction.

Connecting pulse water meters to LoRaWAN and NB-IoT

Once the pulse output and its pulse weight are known, an existing pulse water meter can be connected to remote meter reading without replacing it, provided the interfaces are compatible. The converter counts the pulses, converts them into volume and sends the values over a wireless network.

ACRIOS pulse converters exist in LoRaWAN and NB-IoT versions, each with up to four S0 inputs. The main practical difference is the network. LoRaWAN requires access to a private gateway or coverage from a public LoRaWAN network, while NB-IoT uses an operator SIM card and sends data directly wherever there is coverage, with no gateway.

Both versions support event-triggered alarm messages when configured thresholds are exceeded, independent of the regular reading interval, and both can be reconfigured remotely. Battery-powered versions are designed for over 10 years of operation at hourly readings, with real values depending on configuration and conditions, as explained in battery life in IoT: beyond the datasheet number.

For a single pulse water meter where technicians want to compare the digital value with the register on site, a converter with a display is an alternative, as described in ACR-EX in water utilities.

What a pulse output can and cannot tell

Pulse outputs offer a straightforward way to extend remote reading to existing water meters, provided their electrical characteristics, pulse weight and counting requirements are understood. They are well suited to tracking consumption, but they cannot independently confirm the meter's absolute register value or provide the additional information available through some digital interfaces. The right approach therefore depends on what the existing meter supports and what data the project needs.

Glossary of terms used

  • Debounce: filtering of short, unstable signal changes so that one contact closure is counted as one pulse
  • Dry contact: a potential-free switch that only closes and opens a circuit, without supplying any voltage of its own
  • Encoder register: a meter register that provides its value in digital form instead of individual pulses
  • Hall sensor: an electronic sensor that detects a magnetic field without mechanical contacts
  • LoRaWAN: a long-range, low-power wireless network protocol in which devices send data through gateways to a network server; the network can be public or private
  • M-Bus (Meter-Bus): a wired European standard for reading data from meters such as water, gas and heat meters
  • NB-IoT (Narrowband IoT): a low-power cellular technology operating in licensed mobile operator networks, suited to devices transmitting small amounts of data
  • Pulse weight: the volume represented by a single pulse, as specified for the meter or its pulse output module
  • Reed switch: a pair of metal contacts sealed in a glass tube that close when a magnet passes nearby
  • S0: a standardised electrical interface for transmitting pulses between a meter and a counting device

FAQs

No items found.

Pulse water meters already in place can deliver remote readings once their output type, pulse weight and network conditions at the site are clear. ACRIOS can review the installed meters and recommend a compatible way to connect them.

Blog

Technology

Converter, bus, bridge, gateway: what's the difference?

Converter, bridge, gateway, repeater, concentrator, data logger: metering and IoT datasheets rarely agree on these terms in practice. Following the data path instead of the product label shows exactly where the real functional boundaries between devices sit.
Read more
Technology

LoRaWAN airtime: why radio conditions matter

Two LoRaWAN meters on the same network can communicate very differently. Spreading factor, airtime, payload limits and duty cycle decide how often each meter may transmit, how much data fits into one message and what it costs in battery and network capacity.
Read more
Technology

What actually drains an IoT device battery

Long battery life is achievable, but only with the right configuration. Reading and transmission frequency, sleep design, NB-IoT and LoRaWAN settings, and error handling all shape real-world results. This guide walks through the full power profile, with a deployment checklist.
Read more
How to?

M-Bus parsing strategies for LoRaWAN and NB-IoT

M-Bus telegrams often exceed a single LoRaWAN or NB-IoT uplink. VIF/DIF filtering and three ACRIOS fragmentation strategies, Truncate, Split, and Multiframe, plus an MQTT-over-JSON option on NB-IoT, cover the practical choices for matching data transport to the network in use.
Read more
How to?

How to best replace walk-by meter reading

Walk-by meter reading no longer keeps up, the EED is pushing for frequent consumption data. This article compares three ways to automate readings, cabling, switching to LoRaWAN meters, and a wM-Bus concentrator, and explains when keeping existing meters makes the most sense.
Read more
Technology

Can your existing meters be retrofitted?

Many remote reading projects start with existing metering infrastructure rather than new meters. This practical checklist explains what to assess before choosing a converter, communication network or platform for a successful retrofit project.
Read more
Technology

Battery life in IoT: beyond the datasheet number

Battery life in an IoT device depends on more than capacity. Temperature, communication method, signal quality and the cell's own properties all play a part. A datasheet figure is only a reference value, and real-world performance can look very different depending on the application.
Read more
Opinions and analysis

Agile, Waterfall, or NRE? Choosing a development methodology

Choosing the right collaboration model can determine whether a development project stays on budget, adapts to change, or delivers on time. When Agile, Waterfall, or NRE is the right fit? Why the best approach depends on project's goals, readiness, and technical complexity?
Read more
Technology

Developing adaptive IoT communication under the CRA

ACRIOS is developing a communication module that switches between LoRaWAN and NB-IoT on its own. Backed by the Technology Agency of the Czech Republic, the project aims for more reliable data transmission, lower costs, and security beyond the Cyber Resilience Act.
Read more
Opinions and analysis

Focused supplier or large vendor? Depends on the project

In retrofit connectivity, the biggest vendors win the largest rollouts. But for working meters that only need connecting, not replacing, a focused converter to NB-IoT or LoRaWAN often fits better. A look at where specialists and giants each have the edge.
Read more
Opinions and analysis

Edge computing in IoT metering

M-Bus payloads often exceed LoRaWAN and NB-IoT single-message limits. Edge computing solves this at the source through VIF/DIF filtering, adaptive sampling, local validation, and source encryption. When does it make sense, and when not? A practical decision guide for IoT metering deployments.
Read more
Technology

Manufacturer as a technology partner

The role of IoT device manufacturers is shifting from hardware supplier to technology partner. Parsers, open APIs, containerised backend, remote firmware management and CRA-ready security shorten implementation, reduce internal development load and lower TCO across AMR and AMI projects.
Read more
Technology

Why a device without an antenna fails

If your IoT device manages to connect even without its antenna, that is not a sign of clever engineering. It is a warning sign of poor radio design. Why a properly tuned antenna is essential for reliable wireless meter reading, what really happens inside the device, and how to test it sensibly before full deployment in the field.
Read more
Compliance

CE certification for IoT: What RED DA changes

Development went well, the device works. Then CE certification arrives and the supplier's cybersecurity documentation is missing. Since August 2025, RED DA is in force and part of every CE. How to tell if your supplier is ready, and what to do if not.
Read more
Opinions and analysis

Water losses in utility networks: The hidden cost of leaks

An estimated one in four litres of treated water is lost in European distribution networks. Average losses hover around 25%, exceeding 60% in some countries. A closer look at why pipes fail, what it really costs utilities, and why a slow leak is often worse than a visible burst.
Read more
Opinions and analysis

Pressure monitoring in water networks: Early fault detection

Every utility faces the same question: how to know something is wrong in the network as fast as possible. Acoustic methods, district metered areas and continuous pressure monitoring each bring strengths and limits. A comparison of approaches to leak detection, with real examples.
Read more
Opinions and analysis

M-Bus pressure sensor: Leak detection for water utilities

No parallel infrastructure, no new data platform, no separate operational processes. The joint ACRIOS and Lorenz solution brings continuous pressure monitoring into the same communication layer water utilities already use for smart metering – over LoRaWAN or NB-IoT.
Read more
How to?

The cost of measurement data errors and how to prevent them

Unreliable data is more costly than no data at all, especially in smart metering and energy management. A missing value or small deviation can escalate into incorrect bills, failed audits, or undetected faults. Here is what that looks like in practice and how to prevent it.
Read more
Compliance

Smart Readiness Indicator (SRI): All you need to know

Smart Readiness Indicator (SRI) is the EU's metric for a building's digital intelligence. It rates how well a building manages energy, responds to occupants, and interacts with the grid. Learn what SRI means, what the legislation requires, and what role remote meter reading plays.
Read more
Technology

M-Bus installation tool Wizard from ACRIOS

Configuration errors and troubleshooting often take more time than wiring M-Bus devices. The ACRIOS Wizard simplifies this by guiding technicians through meter detection, data selection, and network setup; reducing installation time and the need for specialised knowledge.
Read more
Technology

Coulomb meter: Everything you need to know

A Coulomb meter measures actual battery charge consumption rather than relying on estimates. This enables realistic end-of-life prediction for IoT metering devices, optimised service intervals, and reduced TCO. How does this technology work in practice, and where does it make the most sense?
Read more
Technology

ACR-EX in water utilities: remote reading of pulse water meters

Pulse water meters are common in water utility networks, but their data often remains on the mechanical register. Learn how existing pulse water meters can be connected to remote reading systems using a pulse converter with display, without replacing the meters.
Read more
Company news

ACRIOS and Quectel announce partnership

ACRIOS Systems and Quectel Wireless Solutions have formed a strategic partnership to support SME manufacturers in adopting modern Linux/Android smart modules. The joint communication outlines the scope and technical goals of the cooperation.
Read more
Opinions and analysis

External or internal? How custom development works

External development helps organisations accelerate project delivery and reduce fixed costs. This article explores when outsourcing truly makes sense, what to consider when selecting a partner, and how to structure collaboration that delivers lasting internal peace.
Read more
How to?

Proven deployment of 10,000 wM-Bus converters for EED

Digitalisation of metering is becoming a strategic priority for utilities. Experience from a project with 10,000 wM-Bus concentrators and 850,000 meters shows that success depends less on technology itself and more on change management, coordination, and structured planning.
Read more
Technology

Choosing a remote reading system for water utilities

Digitalisation brings many ways to read water meters remotely, from bus networks to direct LoRaWAN and NB-IoT communication. Learn how to choose the right approach for your utility based on existing meters, coverage conditions, and investment strategy.
Read more
Opinions and analysis

Open data interfaces pay off for reporting and integration

An open data interface means freedom and independence when working with data. Beyond storing and visualising, it enables export, reporting, automation and smooth integration with other systems. The result is greater flexibility, lower vendor lock-in and sustainable data management.
Read more
Opinions and analysis

15-minute vs daily meter readings frequency explained

How often should you measure energy and water consumption? Fifteen-minute meter reading frequency supports detailed analysis and real-time optimisation, while daily data extend battery life and simplify reporting. Learn about the benefits, trade-offs, and use cases from practice.
Read more
Technology

Scripting in IoT: Flexibility, sustainability, and protection

Many IoT deployments fail when each new customer request requires a firmware change. Scripting solves that by separating customer logic from core functions, it enables faster updates, long-term maintenance, and secure control over unique features.
Read more
Technology

Gas meter data to dashboard: ACR-EX meets Datacake

Get your gas meter data online in minutes with the ACR-EX datalogger and its direct Datacake integration. This reliable NB-IoT solution provides live readings, alerts, and a ready-to-use dashboard. All without the need to develop or maintain your own backend infrastructure.
Read more
Compliance

EPBD is coming: what BACS means for your building

Let’s break down what the BACS mandate, part of EU’s broader initiative EPDB directive, means in practice. Who must comply, which systems and protocols to use, and how to modernise your building with minimal effort using your existing infrastructure.
Read more
Opinions and analysis

When DTLS makes sense. Know before you deploy

Let’s explore when DTLS (Datagram Transport Layer Security) brings real security value to NB-IoT deployments and when it’s smarter to choose a simpler or more energy-efficient alternative. Get clarity before committing to your next smart metering rollout.
Read more
Opinions and analysis

Not your keys, not your hardware

AES encryption protects your data. But without the keys, you don’t really own the device. This article explains why requesting encryption keys matters when purchasing IoT meters, and how it gives you full control over data, integration, and long-term independence.
Read more
Technology

868 MHz or 433 MHz? The right choice for your wM-Bus

Looking for a wireless M-Bus converter but unsure which frequency band to choose? This article compares 868 MHz and 433 MHz, explains key technical differences, and offers practical guidance based on meter compatibility, signal conditions, and installation environments.
Read more
How to?

Everything you need to know, documented. ACRIOS wiki.

One place to find answers to all your technical questions. The ACRIOS wiki simplifies technical communication by bringing together everything needed for configuration, installation, and integration. Online, accessible, and continuously updated.
Read more
Technology

End-to-end custom hardware and software development

Ready-made products can work. Until they don’t. When specific requirements emerge, a custom development approach offers the flexibility to design both hardware and software precisely for the task. Whether it’s a new solution or an upgrade to existing systems.
Read more
How to?

How to collect energy data to support ISO 50001

Energy efficiency is no longer just a buzzword. With rising energy costs and increasing regulatory pressure, frameworks like ISO 50001 are becoming essential. But to optimise energy use, organisations first need one thing: structured, reliable consumption data.
Read more
How to?

Lowering IoT TCO through smart manufacturing

The price tag is just the beginning. Real savings come from what happens after deployment – device setup, integration, maintenance and optimisation. Manufacturers can make all of this easier and cheaper, without compromising on performance.
Read more
How to?

Reading Sensus meters with zero hardware changes

Unifying meter readings across different protocols doesn’t have to mean replacing hardware or relying on a single vendor. Our solution connects even legacy Sensus meters (now part of the Xylem group) into a unified system – without the need to replace your existing devices.
Read more
Opinions and analysis

Why 15-minute data matters in district heating

15-minute interval readings help clarify heat pricing, detect anomalies and reduce billing complaints. They also support transparent cost allocation, a must as dynamic tariffs and EU rules raise the bar. With our converters, you can enable them without replacing your meters.
Read more
How to?

Give me a tool that works. Not a manual.

In the field, there’s no time for unnecessary clicks or second guesses. When every minute costs money, configuration needs to be fast, reliable, and dead simple. Let's have a look at what really works – and why complexity doesn’t belong at the installation site.
Read more
Compliance

5 most common myths about remote meter reading

From 2027, remote meter reading will be mandatory under the European Efficiency Directive. Yet despite growing availability of the technology, many myths and half-truths still surround its implementation. Let's break down five of the most common misconceptions.
Read more
Opinions and analysis

Battery-powered vs wired: What really costs more?

An externally powered data bus may look cheaper on paper. But once you factor in cabling, electrician work, inspections, and long-term upkeep, the story changes. Let's compare and reveal why battery-powered solutions often save more than just money – time, effort, and peace of mind.
Read more
Compliance

Cyber Resilience Act and IoT hardware

The European Union's Cyber Resilience Act significantly reshapes hardware requirements for IoT devices – promoting secure design, manufacturer transparency, and interoperability that is essential for resilience against cybersecurity threats. Learn more about CRA.
Read more
How to?

Next-gen meter readings, no replacements needed

Discover how to modernise your metering system without the high cost of replacing existing meters. With a smart converter, you can enable seamless remote readings using your current infrastructure. Quick to deploy, easy to manage, and fully compliant with EED requirements.
Read more
How to?

Modernising metering infrastructure

Connecting different types of meters into one efficient system can be a major challenge, when dealing with various manufacturers, generations and technologies. Discover how converters offer a smart, cost-effective way to unify even the most diverse metering infrastructures.
Read more
How to?

M-Bus to IoT integration explained

Connecting M-Bus meters to IoT networks like LoRaWAN or NB-IoT is now a critical step in modern utility infrastructure. Discover four practical methods that enable reliable, scalable, and future-ready integration – without complex custom development or delays.
Read more
Opinions and analysis

Understanding TCO: More than just hardware

When investing in new technology, looking beyond the initial hardware cost is more important than crucial. Discover how understanding and managing the total cost of ownership (TCO) can lead to smarter, more sustainable, and financially efficient technology investments.
Read more
Technology

NB-IoT technology: All you need to know

NB-IoT is a low-power, cost-effective IoT technology that ensures reliable connectivity with excellent coverage and security. Ideal for smart cities, industry, energy, and agriculture, it enables efficient communication for a wide range of devices. Let's discover its key features and benefits.
Read more
Technology

LoRaWAN: All you need to know

LoRaWAN is transforming the IoT with its long-range, low-power wireless communication. Ideal for smart cities, agriculture, and industrial automation, it enables efficient, cost-effective, and secure data transmission. Discover how LoRaWAN works and its key benefits.
Read more
Technology

M-Bus, wM-Bus, and RS-485: A technology guide

As cities and industries embrace digital transformation, reliable data collection and communication are essential. M-Bus, Wireless M-Bus (wM-Bus), and RS-485 technologies play a crucial role in smart metering, industrial automation, and infrastructure monitoring.
Read more
Technology

LoRaWAN vs. NB-IoT: Which technology is right for you?

As industries embrace digital transformation, many are upgrading legacy equipment to keep pace with evolving technology. The integration of smart metering and remote monitoring is turning traditional devices into key players in the rapidly expanding IoT ecosystem.
Read more
Technology

Smart metering: What it is and why it matters

Smart metering transforms energy monitoring by real-time insights into electricity, gas, and water use. By upgrading traditional meters with converters, it enables accurate billing, early issue detection, and improved grid efficiency for both consumers and providers.
Read more
Technology

IoT: Technology that saves time and money

If you have been hearing about IoT lately, you are not alone. IoT, short for the Internet of Things, is transforming the way we live and work – saving time, effort, and sometimes hundreds of euros each year and that is why we are leveraging it here at ACRIOS Systems.
Read more
Company news

ACRIOS Systems unveils its brand-new website.

We are excited to introduce new website. With a fresh design and enhanced features, we have created a more intuitive and enjoyable experience. Seamless navigation, improved functionality, and a modern look that makes finding what you need easier. Welcome to our new digital home.
Read more